Seedling ADU Builders adu team

ADU Company in Manhattan Beach - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU Company in Manhattan Beach, CA

Building an ADU in Manhattan Beach typically runs $180,000 – $420,000 depending on whether you’re converting an existing garage or starting from bare dirt, with most Sand Section projects landing in the higher range due to Coastal Zone permits and foundation upgrades. We’re Seedling ADU Builders, and we coordinate every Manhattan Beach build from our Los Angeles office with crews who work these streets weekly. Call us at (707) 383-5338 for a written estimate before any work starts.

Call (707) 383-5338

Manhattan Beach isn’t like other South Bay cities. The same salt air that draws families here chews through standard electrical hardware in alley garages. The same narrow 30-foot lots that make the Sand Section desirable make detached ADUs physically impossible on most parcels. And the same Coastal Commission oversight that protects the shoreline adds a permit layer no inland contractor prepares for. We build here anyway, because we’ve learned what the city expects and what the houses hide.

Why Manhattan Beach Homes Are Different

The Sand Section sits on lots roughly 30 feet wide, with original beach bungalows from the 1920s – 1940s long since replaced by three-story modern builds that max out coverage. What’s left is the alley garage, built in the 1940s – 1960s, now the only realistic ADU path for most owners. But these garages carry two complications: they’re inside Manhattan Beach’s Coastal Zone, so every conversion needs a California Coastal Commission permit on top of city approval, and their original slabs were often poured straight onto compacted beach sand with no continuous footing. We’ve seen that surprise add $30,000 – $50,000 when the foundation has to be built from scratch.

The Hill Section and Tree Section offer more forgiving 1950s – 1970s ranch lots where detached new-construction ADUs and JADUs actually fit. Even there, the marine layer and salt-laden air within a few blocks of the Strand accelerate corrosion on panels and plumbing fittings. We spec marine-grade and stainless hardware as standard near the water, not as an upsell. Sandy substrate and a shallow water table in low-lying areas also mean moisture management and occasional foundation work that Torrance or Hawthorne jobs simply don’t encounter.

Our Main Manhattan Beach Services

Most Manhattan Beach families who call us start with one of these three projects. Each has its own page with neighborhood-specific detail.

Home Addition Contractor in Manhattan Beach

Home additions in Manhattan Beach usually mean building up or back on Hill Section and Tree Section lots where coverage allows, or carefully threading setbacks in the Sand Section where every square foot counts. We pull Coastal Development Permits when required, coordinate structural engineering for hillside lots, and protect your main house with sealed dust barriers and quiet-tool scheduling during school hours. Our crews wear shoe covers, lay drop cloths, and photograph the clean space before leaving each day. Home Addition Contractor in Manhattan Beach

Home Addition Contractor in Manhattan Beach

Garage Conversion Contractor in Manhattan Beach

Garage conversions are the dominant ADU type in Manhattan Beach because the Sand Section’s narrow lots leave no alternative. We convert hundreds of alley-accessed two-car garages into permitted dwelling units, handling the dual-permit process through both the city and the California Coastal Commission. Before we quote, we probe the slab condition, because a garage poured onto beach sand with no footing needs a full perimeter foundation before framing begins. That discovery is never fun, but we’d rather you know upfront. Garage Conversion Contractor in Manhattan Beach

Garage Conversion Contractor in Manhattan Beach

ADU Builders in Manhattan Beach

Our ADU work spans detached new construction on larger Tree Section lots, attached additions where setbacks permit, and garage conversions throughout the Sand Section. We work with prefab and modular partners including Abodu, Cover, and Dvele when the lot geometry and access allow factory-built delivery, and we stick-build when Coastal Commission scrutiny or tight alley access makes site-built the smarter path. Every project gets a written price before work starts, backed by our 365-Day Done Right Promise. ADU Builders in Manhattan Beach

ADU Builders in Manhattan Beach
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (707) 383-5338

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Brands We Service in Manhattan Beach

We install and finish with James Hardie siding, Abodu and Cover modular units, and Dvele smart-home prefab systems, with parts and warranty support stocked locally through our Los Angeles coordination office. Most brand-specific repairs or finish upgrades ship within 48 hours.

Pricing for ADU Company in Manhattan Beach, CA

Service Typical range in Manhattan Beach
Garage conversion ADU (slab intact) $180,000 – $280,000
Garage conversion ADU (new foundation required) $210,000 – $330,000
Detached new-construction ADU (Tree Section/Hill Section) $320,000 – $420,000
JADU (attached junior unit, existing structure) $120,000 – $190,000
Coastal Development Permit processing $8,000 – $15,000
Foundation upgrade (beach sand substrate) $30,000 – $50,000
Marine-grade electrical/hardware package $4,000 – $7,500
Moisture barrier and drainage (shallow water table) $6,000 – $12,000

What pushes Manhattan Beach prices higher: Coastal Zone permits add time and filing fees, beach-sand foundations often need full replacement, and marine-grade materials cost more than standard hardware but last in salt air. What doesn’t change: you’ll have our written price before any work starts, with no surprise line items added after crews arrive.

Neighborhoods We Serve in Manhattan Beach

We work across Manhattan Beach’s distinct zones, from the Strand-adjacent alleys of the Sand Section to the quiet ranch streets of the Tree Section. Most Manhattan Beach projects start within a week of permit readiness.

  • Sand Section
  • Hill Section
  • Tree Section
  • East Manhattan Beach
  • El Porto (north city limits)

Service Area – Cities Near Manhattan Beach

Our crews serve the full South Bay corridor. We regularly build and convert in Hermosa Beach, CA, handle larger-lot ADUs in El Segundo, CA, and take on garage conversions and additions in Lawndale, CA and Hawthorne, CA. Dispatch and scheduling run from our Los Angeles office, with local crews assigned by project type and neighborhood familiarity.

Serving Manhattan Beach, CA - Our Local Coverage Area

We’re based in the Manhattan Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Manhattan Beach

Ready to get started? Free estimates · Free in-home estimates response in Manhattan Beach
Call (707) 383-5338

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Manhattan Beach Customers Say

★★★★★ 5.0 from 3+ reviews

"Garage conversion into a studio. They sealed off the work area so dust didn't get into the house, and cleaned up every day before leaving. Calm, careful team to have around."

- Darnell Hobbs

"Added a backyard cottage. The team protected our existing landscaping and left the yard clean every evening. Gentle, respectful, and they walked us through each stage calmly."

- Tamara Welsh

"Garage to studio conversion with us living right there. They sealed off the dust, cleaned up daily, and respected our quiet hours. No surprise costs. Beautiful."

- Terrence Boylan

How It Works in Manhattan Beach

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Manhattan Beach - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Shoe Covers and Drop Cloths on Every Visit

Expires Mar 31, 2027
Included

Photo of the Clean-Up Before We Leave

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Manhattan Beach - we'll get back to you fast. No obligation.

By reaching out through this form, you confirm you have read our Privacy Policy and consent to being contacted via phone, email, or SMS about your service request, including from the local pros who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch