A quiet residential street with a new ADU behind one of the homes
Orange, CA

ADU Company in Orange - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 25 years of experience
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A second-story addition that matches the existing roofline
A new bathroom inside a converted garage
A former garage converted into a guest house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Company in Orange, CA

Building an ADU in Orange typically runs $120,000 – $350,000 depending on whether you’re converting an existing garage, adding a detached unit, or building a home addition, with permits taking 3 – 6 months in historic districts versus 6 – 10 weeks elsewhere. Orange’s inland climate, older housing stock, and historic preservation requirements make each project distinct from coastal Orange County jobs. We dispatch crews from the Los Angeles area and coordinate builds across Orange’s varied neighborhoods, from Old Towne’s alley-served lots to the postwar tracts near Santiago Hills. Call (707) 383-5338 to schedule your free estimate.

Call (707) 383-5338

Why Orange Homes Are Different

The living room inside a new ADU

Orange sits far enough inland that summer afternoons regularly hit 8 – 12°F above coastal cities like Newport Beach, and the Santa Ana wind corridor through Santiago Canyon pushes extreme low-humidity heat events that can make poorly sized ADUs unlivable in July and August. We size mini-splits and insulation for this actual heat load, not the milder coastal standard.

The housing stock splits sharply by era. Old Towne Orange, centered on the Plaza traffic circle, holds one of California’s largest historic districts, with late-1800s to 1920s Victorians and Craftsmans on alley-served lots. These properties offer ideal garage conversion footprints, but their 60-amp panels, galvanized supply lines, and minimal insulation require full upgrades before permitting. The Historic Preservation Commission enforces design compatibility even for alley-visible structures, meaning custom window profiles and period-appropriate siding often pass through multiple Design Review Committee hearings.

East of the Plaza, toward Santiago Hills, 1950s – 1970s postwar tracts on larger R-1 lots allow more straightforward detached backyard ADUs, though lot coverage calculations still demand careful attention. The rental demand from Chapman University students and faculty in Old Towne’s blocks makes navigating that design review process unusually worthwhile.

Our Main Orange Services

Most Orange homeowners who call us are weighing one of three paths: expanding their main house, converting an underused garage, or building a separate dwelling on their lot. Each has its own Orange-specific considerations, and each has its own dedicated page on our site.

Home Addition Contractor in Orange

Home additions in Orange range from master suite expansions on Santiago Hills ranches to second-story pop-ups in Old Towne where height restrictions and historic compatibility rules apply. We pull all required permits, coordinate with Orange’s building department on structural calculations, and protect your existing living space with sealed dust barriers and quiet-tool protocols during school hours. Every addition receives a written price before we break ground. Home Addition Contractor in Orange

Home Addition Contractor in Orange

Garage Conversion Contractor in Orange

Garage conversions dominate our Orange calls, especially in Old Towne where alley-accessed detached garages are standard. The Historic Preservation Commission’s design-compatibility review for alley-visible structures catches out-of-town contractors who expect ministerial county approval. We prepare custom window profiles, period-appropriate siding samples, and DRC packet documentation from the start, so hearings don’t stall your timeline. Garage Conversion Contractor in Orange

Garage Conversion Contractor in Orange

ADU Builders in Orange

Detached ADUs in Orange range from prefab units by Cover or Mighty Buildings to site-built structures on postwar R-1 lots. We work with your lot coverage, setback, and utility capacity to size the unit correctly for Orange’s inland heat load, not a coastal template. The local pro backgrounds are verified, uniforms marked, and every visit ends with a clean-up photo before we leave. ADU Builders in Orange

ADU Builders in Orange
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (707) 383-5338

Brands We Service in Orange

We maintain hands-on access to leading ADU brands including Cover, Dvele, Mighty Buildings, and Boxabl, with material coordination through James Hardie for siding that meets Orange’s historic compatibility requirements where needed. Most prefab unit inquiries in Orange see initial feasibility feedback within two business days. See our brands for full specifications.

Pricing for ADU Company in Orange, CA

Service Typical range in Orange
Garage conversion (basic, no historic review) $85,000 – $140,000
Garage conversion (Old Towne historic district) $110,000 – $175,000
Detached prefab ADU (standard lot) $120,000 – $220,000
Detached site-built ADU (standard lot) $180,000 – $350,000
Home addition (single-room, ground floor) $150,000 – $250,000
Home addition (second story or complex structural) $250,000 – $450,000
Electrical panel upgrade (60A to 200A) $4,500 – $8,500
Plumbing repipe (galvanized to copper/PEX) $6,000 – $12,000
HVAC mini-split system (Orange heat-load sized) $4,000 – $7,500
Historic Design Review Committee documentation $2,500 – $5,000

Historic district requirements and full utility upgrades push Orange projects toward the higher end of these ranges, particularly in Old Towne where multiple DRC hearings extend design-phase costs. Every family receives a written, line-item price before any work begins, with no surprise additions after crews arrive.

Neighborhoods We Serve in Orange

We build across Orange’s full footprint, from the Plaza-adjacent blocks of Old Towne to the hillside lots near Santiago Oaks Regional Park. Crews typically arrive within scheduled morning or afternoon windows throughout the city.

  • Old Towne Orange
  • Santiago Hills
  • El Modena
  • Orange Park Acres
  • Anaheim Hills border area

Service Area – Cities Near Orange

The local pros coordinate builds throughout central Orange County, with regular projects in Santa Ana, CA to the south, Tustin, CA to the southwest, Garden Grove, CA to the west, and Placentia, CA to the north. Scheduling and permit research for each city are handled from the Los Angeles area with local crew dispatch.

Serving Orange, CA - Our Local Coverage Area

We’re serving the Orange area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Orange

A new two-story ADU over a garage

Ready to get started? Free estimates in Orange
Call (707) 383-5338

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Orange Customers Say

★★★★★ 5.0 from 3+ reviews

"Garage conversion into a studio. They sealed off the work area so dust didn't get into the house, and cleaned up every day before leaving. Calm, careful team to have around."

- Darnell Hobbs

"Added a backyard cottage. The team protected our existing landscaping and left the yard clean every evening. Gentle, respectful, and they walked us through each stage calmly."

- Tamara Welsh

"Garage to studio conversion with us living right there. They sealed off the dust, cleaned up daily, and respected our quiet hours. No surprise costs. Beautiful."

- Terrence Boylan

How It Works in Orange

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Orange

Every build below starts the same way: a free site visit and a written price.

Getting started with Seedling

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Included

Shoe Covers and Drop Cloths on Every Visit

Expires Mar 31, 2027
Included

Photo of the Clean-Up Before We Leave

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Orange. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch